summer`99



Operation Path & Goal Target
June - September


A. Sealcoat Preparation
Asphalt Patch Streets & Alleys
Sweep Sealcoat Workzones
Apply Seal Resurfacing

B. Asphalt Overlay Operation
A/C Patch and Prepare
Set Manholes to Grade

C. Street Reconstruction
Blade & Windrow Sub-Base
Rock & Blade Base to Grade
Set Manholes to Grade
Inspect Asphalt Paving

D. Vegatation Control
Mow Flood-Dikes
Mow Road Right of Ways

Proposed Asphalt Overlay Resurfacing Projects


* Bellview East Housing * Dicks Marine Office/Shop Area *
* Lake Street from Sioux St. to Chippewa St. * Lower Lake Park Dr. *
* Wildwood Dr. * Michaelwood Dr. * Thomas Ln. *
* Barbara Ct. * Crestlock Way *




Home