Fiber-Optic Network Construction

Building a fiber-optic network takes months of planning—from network design and ordering of equipment to locating utilities and actual construction, there is a great deal of work to be done before we can connect your home to HBC fiber services.

Rest assured, our team is committed to working efficiently and ensuring the work is done right the first time around. Our goal is to keep you informed as we move through the process and get your home connected as quickly as possible.

The Construction Process

033022 Construction Process Icons &Ndash; Hbc

Helpful Information

Ready to sign up for HBC service? Click “Live Chat” in the bottom right corner to chat with us online, call us at (888) 474-9995, or stop by your local HBC office.

To connect your home to HBC services, a fiber-optic line (“drop”) is required and can be buried to your home while we are constructing the network. This will be done at no additional cost to you and will prepare your home to receive HBC services as soon as construction is complete.

During the colder months, a temporary drop can be installed to bring services to your home and will be buried in the spring when ground conditions allow.

Once boring and fiber drops are completed, crews will work to restore any mild lawn disturbances by smoothing out the soil and adding grass seed.

Complete the Drop Burial Authorization Form online. 

Local Customer Care (888) 474-9995

Construction Hotline (888) 474-9995

Winona PON Boundaries

2025 Construction Progress Updates

11/11/25

Crews continue to make steady progress across Winona as Flight Fiber expands to even more neighborhoods!

PONs 23, 11, 3, 16, 15, and 9—Flight Fiber Internet service is available in these areas! If you haven’t already made the switch, now’s the perfect time—contact us to learn about the great offers available in your neighborhood.

To get started, reach out using one of the following options:

  • Call our Customer Experience Team at (888) 474-9995
  • Order HBC services online at hbci.com/order
  • Visit our Winona storefront at 58 Johnson St.

PON 10—Splicing began a bit sooner than expected, which means services are also expected to be ready ahead of schedule—likely around the week of November 24.

PON 21—Aerial construction is still on track to begin November 13, with a tentative service release the week of December 1.

PON 22—Aerial construction will now begin the week of November 24, just a short delay from the original plan. We appreciate your patience as crews adjust schedules during this busy construction phase. Services are expected to be available the week of December 8.

PON 37—Aerial work is now expected to begin the week of November 24, with services tentatively scheduled for release the week of December 15.

We’re thrilled to see more of Winona lighting up with Flight Fiber each week—thanks for your continued patience and excitement as we bring more neighborhoods online!

11/05/25

Things are shaping up nicely in Winona—more neighborhoods are coming online each week as Flight Fiber expands to even more homes!

PONs 23, 11, 3, and 16—These areas are fully completed and have been released for Flight Fiber installations. If you haven’t already made the switch, now’s a great time to experience fast, reliable Internet built right here in Minnesota.

PONs 15 and 9—Both areas were officially released for service on October 31—great news for residents ready to get connected!

To get started, reach out using one of the following options:

  • Call our Customer Experience Team at (888) 474-9995
  • Order HBC services online at hbci.com/order
  • Visit our Winona storefront at 58 Johnson St.

PON 10—Splicing is set to begin November 10, with a preliminary target release date of November 17 for service availability.

PONs 21 and 22—Aerial construction is expected to begin the week of November 10.

PON 37—Underground construction is complete, and aerial work is scheduled to begin November 17.

Crews are hard at work bringing Flight Fiber to even more Winona neighborhoods—stay tuned for what’s next!

10/29/25

There’s plenty of great progress happening in Winona!

PONs 23, 11, 3, and 16—All construction and restoration are 100% complete, and these areas have been officially released for Flight Fiber Internet installations. Residents in these areas can get connected using one of the options below:

To get started, reach out using one of the following options:

  • Call our Customer Experience Team at (888) 474-9995
  • Order HBC services online at hbci.com/order
  • Visit our Winona storefront at 58 Johnson St.

PONs 15 and 9—Both areas are set to be released for service on October 31.

PON 10—Construction began on October 27 and is moving right along.

PONs 21 and 22—Aerial construction is scheduled to begin the week of November 10.

Bit by bit, we’re getting more of Winona connected to Flight Fiber—one neighborhood at a time!

10/21/25

PON 23—Great news, folks—Flight Fiber Internet is now available in your neighborhood! Current customers will need to contact us to schedule an appointment to upgrade their service to fiber.

To get started, reach out using one of the following options:

  • Call our Customer Experience Team at (888) 474-9995
  • Order HBC services online at hbci.com/order
  • Visit our Winona storefront at 58 Johnson St.

PONs 15 and 9—These areas are slated to be released for service on or around October 31.

PON 37—All underground work is complete.

PON 10—Construction is scheduled to begin October 27. Residents in this area have been notified with details about the upcoming work.

PONs 21 and 22—Construction is scheduled to begin November 10. Residents in these areas have also been notified with information on the upcoming construction.

09/09/25

PON 23—Construction is complete and ready for customers to install!

Contact us today:

  • Call our Customer Experience Team at (888) 474-9995
  • Order HBC services online at hbci.com/order
  • Visit our Winona storefront at 58 Johnson St.
PONs 3 and 11—Splicing is completed and testing is underway.

07/02/25

PON 23—Aerial construction is complete, and we will move on to splicing this PON.

Note to current customers, you will need to schedule an appointment in order to convert your service to fiber Internet. Homes in this area have been sent a letter explaining the construction process, and will also receive a door tag.

PONs 11—Aerial construction is underway!

06/24/25

PON 23—Construction for the fiber overbuild of Winona PON 23 is underway!

Note to current customers, you will need to schedule an appointment in order to convert your service to fiber Internet. Homes in this area have been sent a letter explaining the construction process, and will also receive a door tag.

06/16/25

PON 23—Construction for the fiber overbuild of Winona PON 23 is underway! PONs 11 and 3 will follow. Stay tuned for updates as crews build new fiber services.

Current customers are welcome to call to schedule their fiber conversion early! This will require migration from the current cable technology to the fast, modern fiber service. Call today! Homes in this area have been sent a letter explaining the construction process, and will also receive a door tag.

06/09/25

PON 23—Crews are starting construction for the fiber overbuild of Winona PON 23. PONs 11 and 3 will follow. Stay tuned for updates as crews build new fiber services.

Homes in this area have been sent a letter explaining the construction process, and will also receive a door tag.

05/19/25

PON 23—Crews will be starting construction for the fiber overbuild of Winona PON 23 next week. PONs 11 and 3 will follow. Stay tuned for updates as crews build new fiber services.

Homes in this area have been sent a letter explaining the construction process, and will also receive a door tag.

01/13/25

PON 55—Construction for the fiber overbuild of Winona PON 55 is complete and ready for installation. This PON includes Conrad Drive, Ridgewood Drive, and Wincrest. Contact us today:

  • Call our Customer Experience Team at (888) 474-9995
  • Order HBC services online at hbci.com/order
  • Visit our Winona storefront at 58 Johnson St.

MISC—This is the final update for the 2024 construction season! Thank you for following along and we are excited to overbuild more areas of Winona in 2025.

01/06/25

PON 55—The fiber overbuild of Winona PON 55 is complete and ready for installs. This area includes Wincrest, Ridgewood Drive, and Conrad Drive. Reach out to us today to get started:

  • Call our Customer Experience Team at (888) 474-9995
  • Order HBC services online at hbci.com/order
  • Visit our Winona storefront at 58 Johnson St.

MISC—As the construction season wraps up, new drop bury requests will be paused. Requests received during this time will be scheduled for burial in the spring when conditions improve. In most cases, a temporary drop can be installed to ensure service to your home. We will make every effort to complete drop buries already on the schedule, as long as weather conditions allow.